Discussion:Recommandations pour l'amélioration de la CEM

De Guide de l'Installation Electrique
Aller à :navigation, rechercher

Chapter R >> Migration Done

Level3/4 changed

Images

PDF pg R17 >> Fig R15d >> Cells with fig.(row 1,2 and 3) >> color to be changed to orange as per FR specifications or not? >> To be checked

CEM : réseaux de communication#Protection contre les perturbations générées par les bobinages

Module 3.9 >> Pending for migration >> To be confirmed

this paragraph is more or less a duplicate content which already exists in chapter J
we deleted this duplicate content in EN guide (just kept a title and "refer to chapter J ..."), but this was not done in FR guide
Romain please check if it is only duplicate content, or if there is extra content compared to chapter R, as it is not the same as EN guide
in particular, in FR guide, there is R19 on page R20, which never existed in EN guide ... but I think figure J42 in EN guide 2016 provides similar information in a different format
then please confirm what to do (for this § in chapter R ... and if needed some modifications in chapter J similar section)
--LMischler (discussion) 6 juillet 2016 à 05:42 (EDT)

PDf pg R25 >> Module 3.12 >> Text converted to table for better readability

CEM : références normatives

yes, better, some modifications done--Romain.R (discussion) 11 juillet 2016 à 08:10 (EDT)