Discussion:Recommandations pour l'amélioration de la CEM
De Guide de l'Installation Electrique
Chapter R >> Migration Done
Level3/4 changed
- PDF pg R2 >> Terminologie et définitions de la CEM
- PDF pg R2 >> La protection des personnes et la CEM
- PDF pg R26 >> Couplage par impédance commune
- PDF pg R32 >> Recommandations de câblage#Classification des signaux
Images
- PDf pg R4 >> Fig R2 >> Text below image is missing in PDF >> To be checked (to incorporate or not?)>> Distribution BT avec des équipements sensibles
PDF pg R17 >> Fig R15d >> Cells with fig.(row 1,2 and 3) >> color to be changed to orange as per FR specifications or not? >> To be checked
CEM : réseaux de communication#Protection contre les perturbations générées par les bobinages
- not sure it is necessary ... Romain what do you think ? --LMischler (discussion) 11 juillet 2016 à 12:49 (EDT)
Module 3.9 >> Pending for migration >> To be confirmed
- this paragraph is more or less a duplicate content which already exists in chapter J
- we deleted this duplicate content in EN guide (just kept a title and "refer to chapter J ..."), but this was not done in FR guide
- Romain please check if it is only duplicate content, or if there is extra content compared to chapter R, as it is not the same as EN guide
- in particular, in FR guide, there is R19 on page R20, which never existed in EN guide ... but I think figure J42 in EN guide 2016 provides similar information in a different format
- then please confirm what to do (for this § in chapter R ... and if needed some modifications in chapter J similar section)
- --LMischler (discussion) 6 juillet 2016 à 05:42 (EDT)
DONE
Images
- PDF pg R21 >> Fig R20 >> converted manually >> To be checked (For Laurent) >> CEM : câblage des armoires
- Fig R22 and R24 are having Fig note text >> To be checked >> (For Laurent) >> Couplage par impédance commune
PDf pg R25 >> Module 3.12 >> Text converted to table for better readability
- yes, better, some modifications done--Romain.R (discussion) 11 juillet 2016 à 08:10 (EDT)